Caution when choosing the right attachment / Installation size list
Installing the upper fixture involves securing it to a load cell. Specific screw sizes are designated as follows:
Load | Under 500N | 1kN〜10kN | 20kN | 50kN | 100kN |
Model | SV-55CB | SVZ-201F-100/200 | SDW-020F | SDW-050F | SDW-100F |
SVZ-201F-50 | SDT-204F-100-200 |
|
|
| |
SDT-204F-50 | SDT-504F |
|
|
| |
| SDW-002F |
|
|
| |
| SDW-005F |
|
|
| |
| SDW-010F |
|
|
| |
Screw size | M6P1 | M12P1.75 | M16P1.5 | M24P2 | M32P2 |
When a jig of the small capacity is installed with the additional load range, The joint screw is necessary.
Model | SV-55CB(※1) | SDW-002F | SDW-010F | SDW-050F | SDW-100F |
SVZ-201F | SDW-005F | SDW-020F |
|
| |
SDT-204F |
|
|
|
| |
SDT-504F |
|
|
|
| |
T-nut | M8P1.25 | M8P1.25 | M12P1.75 | M16P2 | M20P2.5 |
T Groove size |
|
|
|
|
|